Hi-Tech Telematics India Pvt Ltd undertakes turnkey installation & de-installation projects for complete telecom networks
 
BTS

We are the leading service providers in BTS outdoor and indoor work:

Outdoor

  • Fixing of cable ladder for supporting
  • Outdoor work consists of fixing of RF antenna and Microwave antenna
  • Routing of cables
  • Clamping
  • Ground / Earthing
  • Alignment of Antenna as per specifications

Indoor

  • Installation of Radio Base Station (RBS)
  • Installation of Tx. Rack
  • Fixing of cable ladder
  • Grounding of equipments
  • Installation of rectifier and battery bank
 
GSM Antenna Installation

The installation of antenna mounting pipes associated with mechanical arrangement will be examined and where necessary corrected to ensure the following: -

  • Desired Orientation
  • Desired Height
  • Grounding
  • Lighting Protection
Antenna Installation Process

The antenna installation will be carried out using the following resources: -

  • Trained team
  • Expert supervision
  • Site Master
  • E1 Tester
  • SDH Analyzer
Top

Testing and Commissioning of BTS / MW Equipment

Hi-Tech Telematics India Pvt Ltd undertakes the task of testing and commissioning of telecom equipment on site. It usually involves the following:

DLC (Digital Loop Carrier)  

DLC rack and installation of cards like FXS, PRM, E1 and BRI will be installed by our engineers

  • FXS cables routed at MDF frame and kroned.
  • E1 cable routed at TX. rack and kroned.
  • Power cables routed and connected to DLC rack and power up the DLC.
FSO
  • Installation will be done for two link heads.
  • Installation of MUX.
  • Power-up to Mux and link head.
Alignment & Commissioning of linkhead

LOS (Line of Sight Survey)

  • GPS
  • Binoculars
  • Altimeter
  • Compass
  • Digital Camera
  • Topographic maps

W Antenna Installation

  • The mounting accessories of the MW antennae will be inspected and the mounting arrangements will be organized for the required orientation.
  • The antennae, the wave-guide locks, flexible wave guides will be fixed with due care taken to ensure reliable and proper RF connections.
  • The outdoor radio unit & antenna support arms are finally fixed.
  • Alignment of Antenna of the link will be done to achieve the required signal level.

TNMS (Telecom Network Management Systems)
After the completion of Installation & Commissioning of MW Antenna there is a need to monitor these MW links between the sites from MSC. This online monitoring will be done by TNMS software by our engineers.

Top
Rack Installation

The rack for the installation of indoor unit and other equipment will be installed in the equipment room by grouting the bolts in the floor. The rods will be used if additional support is required.

Installation & Commissioning of Multiplexers in MSC, BSC and Cell Sites
  • Installing the mux in the rack and powering up from DC Distribution Box.
  • Installing The NVM (Non Volatile Memory) cards in the Mux.
  • Installing The DCDB in the rack.
  • Power tapping from rectifier to DCDB.
  • Installing the tributary cables from mux to Digital Distribution Frame.
  • Kroning the E1s in their respective krone modules (Tx, Rx).
  • Labeling the krone modules like TXs and RXs, and tributary cables.
  • Earthing the rack, and mux, from the earthing bar (less than 1 ohm) in the shelter.
  • Commissioning of mux.
  • Giving IP Address for DCC and Ethernet for management purpose.
  • Checking all kroned E1s with giving local loops from PC by using Bit Error Rate (BRR) Meter.
  • Checking mux Tx power of all out ports.
  • Checking the transmitting power of both the optical ports using power meter.
  • Checking mux receiving sensitivity of optical ports by using variable mechanical attenuator.
Top
Electrification in Shelters of Cell Sites
Earthing System
The earthing system is designed to achieve the uniform earth resistance of less than 1 ohm at the site. The grounding system consists of the following Sub Systems:

Earthing pits - 4 no, one for lightning protection of tower and equipment shelter, one for the electronic equipment inside the shelter, one for the DG neutral earth and one for the DG body earth.

Earth conductor runs from the lightning protection system, Principal ground bar maintained as reference in the shelter for electronic equipment, DG neutral and DG body to the respective earth pits.

 
Resource Support Management

We are also providing resources for Installation, Commissioning and Integration along with latest equipments like Site Masters / Site Analyzers, RF Power Meter, High Graded Laptops, Variable / Fixed Attenuator, E1 Tester, Optical Fiber Scope, Frequency Counters, Optical Power Meter, Digital Earth Meter, GPS, Binocular, Digital Camera etc., and other tools.


Top
 
 
   
Quick Links
Telecom
Towers supply
Shelters for Telecom Applications
 
About Us
Profile
Technical Team
Business Portfolio
Key Executive
Our Presence at Andhra Pradesh
  © 2008 Hi-Tech Telematics India Pvt Ltd.. All Rights Reserved. Hi-Tech  |  Sitemap  |  Privacy Policy
"));